Mr
& Mrs Clark |
|
|
2
Roehampton Gate |
13.10.2006 |
|
|
|
|
SW15
5JS |
|
ESTIMATE
subject
to terms and conditions overleaf
Further
to our recent site survey, please find herewith our quotation to supply and lay
carpet flooring at the above mentioned address as detailed below.
Loft,
Main Bedroom, Sports room, Stairs and Landings.
To
supply and fit Thatch carpeting, 5 metre wide,
Colour
10 @ £16.00 per square metre to Loft, Stairs and
Landings,
To
supply and fit Mayfair Link or La Maison carpeting, 4 metre wide,
Colour
to select @ £19.50 or £23.00 per square metre to Main
Bedroom,
To
supply and fit All Wool Berber carpeting, 4 metre wide,
42oz
Wool Felt underlay to be laid beneath throughout,
Paperfelt
interliner to be laid beneath,
Fitting
to same, re-using existing gripperod fixings and gripper supplied by customer as
agreed,
Supply
& fix Polished Chrome door bars as required
Uplift
and dispose of existing materials,
Move
and replace furniture as necessary (customer to move any fragile or personal
items).
For
the sum of: - (with
For
the sum of: - (with La Maison @
£23.00m2) £
4321.00
Continued
on Page 2.
1)
During
our site survey it was noted that a number of doors might require trimming to
allow sufficient clearance for the new carpets and underlay. This work cannot be
carried out by the carpet fitter. We can recommend a contractor to carry out
this work if required.
2)
Due
to the length of the landing, the joists in the Loft and the width of the Loft
there will be some seams in order to carry out the installation as
discussed.
3)
We
have quoted on Polished Chrome door bars as agreed, however if you were to go
ahead with Aluminium door bars it would be less £248.00 off of either of the
above quotes.
4)
We
will be supplementing any gripper that is needed with the gripper that you
provide us as agreed.
5)
Due
to the height of the bathroom tiles off of the hall we would have to fit up to
it doing the best job possible given the height difference as discussed and
agreed on site.
We
trust the above meets with your approval and this estimate is guaranteed for a
period of 21 days. Thereafter it may be subject to a price increase. I look
forward to receiving your further instructions in due
course.
Payment
terms:
50% Deposit payable
with order
Balance payable to
fitter on day of installation or 30 days after ordering when fitting is delayed
at customers request.